Order Number |
636738393092 |
Type of Project |
ESSAY |
Writer Level |
PHD VERIFIED |
Format |
APA |
Academic Sources |
10 |
Page Count |
3-12 PAGES |
Buy Network Infrastructure Design Diagramming
Rubric Name: Deliverable 1: Network Infrastructure Design Diagramming
This table lists criteria and criteria group name in the first column. The first row lists level names and includes scores if the rubric uses a numeric scoring method.Evaluation Criteria
Exceeds
Meets
Approaches
Does not Meet
Criterion Score
1.1.3: Present ideas in a clear, logical order appropriate to the task.
10 points
Presents a logical flow of ideas that is easily identifiable and completely appropriate to the task.
8.5 points
Presents ideas in a clear, logical order appropriate to the task.
7.5 points
Attempts to present ideas, but the logic is not clear and/or not appropriate to the task.
0 points
Does not present ideas in a clear, logical order appropriate to the task.
/ 10
2.2.2: Evaluate sources of information on a topic for relevance and credibility.
10 points
Evaluates sources of information thoroughly and appropriately on a topic for relevance and credibility.
8.5 points
Evaluates sources of information on a topic for relevance and credibility.
8.5 points
Attempts to evaluate sources of information on a topic for relevance and credibility, but there are gaps in the evaluation.
0 points
Does not evaluate sources of information on a topic for relevance and credibility.
/ 10
10.1.1: Identify the problem to be solved.
16 points
Presents a relevant IT problem clearly and specifically.
13.6 points
Presents an IT problem that requires a solution.
12 points
Identifies an IT problem but may lack clarity and/or specificity regarding the need to be addressed.
0 points
Does not identify an IT problem to be solved.
/ 16
10.1.2: Gather project requirements to meet stakeholder needs.
16 points
Identifies IT project requirements in a thorough and clear manner to meet all stated stakeholder needs.
13.6 points
Identifies IT project requirements to meet stated stakeholder needs.
12 points
Attempts to identify project requirements to meet stakeholder needs, but there are gaps and/or lack of clarity.
0 points
Does not identify IT project requirements to meet stated stakeholder needs.
/ 16
10.1.3: Define the specifications of required technologies.
16 points
Defines thoroughly and clearly the specifications of required technologies.
13.6 points
Defines the specifications of required technologies.
12 points
Attempts to define the specifications of required technologies, but there are gaps and/or lack of clarity.
0 points
Does not define the specifications of required technologies.
/ 16
13.1.1: Create documentation appropriate to the stakeholder.
16 points
Creates thorough and accurate IT documentation that exceeds requirements.
13.6 points
Creates IT documentation that meets requirements.
12 points
Creates IT documentation that lacks detail and/or does not fully meet requirements.
0 points
Does not create appropriate IT documentation.
/ 16
13.2.1: Evaluate vendor recommendations in the context of organization requirements.
16 points
Evaluate and provides detailed justification for vendor recommendations in the context of organization requirements.
13.6 points
Evaluates vendor recommendations in the context of organization requirements.
12 points
Attempts to evaluate vendor recommendations in the context of organization requirements, but some recommendations lack detail or do not consider context.
0 points
Does not evaluate vendor recommendations in the context of organization requirements.
/ 16
Rubric Total ScoreTotal
/ 100
Overall Score
Overall Score
Level 427 points minimum
Level 320 points minimum
Level 213 points minimum
Level 10 points minimum
Associated Learning Objectives
Learning Objective
1.1.3: Present ideas in a clear, logical order appropriate to the task.
Assessment Method: Score on Criteria – 1.1.3: Present ideas in a clear, logical order appropriate to the task.
Required Performance: Meets
Learning Objective
10.1.1: Identify the problem to be solved.
Assessment Method: Score on Criteria – 10.1.1: Identify the problem to be solved.
Required Performance: Meets
Learning Objective
10.1.2: Gather project requirements to meet stakeholder needs.
Assessment Method: Score on Criteria – 10.1.2: Gather project requirements to meet stakeholder needs.
Required Performance: Meets
Learning Objective
10.1.3: Define the specifications of required technologies.
Assessment Method: Score on Criteria – 10.1.3: Define the specifications of required technologies.
Required Performance: Meets
Learning Objective
13.1.1: Create documentation appropriate to the stakeholder.
Assessment Method: Score on Criteria – 13.1.1: Create documentation appropriate to the stakeholder.
Required Performance: Meets
Learning Objective
13.2.1: Evaluate vendor recommendations in the context of organization requirements.
Assessment Method: Score on Criteria – 13.2.1: Evaluate vendor recommendations in the context of organization requirements.
Required Performance: Meets
Learning Objective
2.2.2: Evaluate sources of information on a topic for relevance and credibility.
Assessment Method: Score on Criteria – 2.2.2: Evaluate sources of information on a topic for relevance and credibility.
Required Performance: Meets